Table of Contents
CIP Technical Steering Committee Meeting
Roll Call
Agenda
Updates and Discussions
DebConf report
Project X update
Real-time Linux Project
Kernel Maintenance
CIP Testing
ELCE preparation
CIP Technical Steering Committee Meeting
Date: 21 August, 2017
Roll Call
Agustin Benito Bethencourt (Codethink)
Laura (Linux Foundation)
Hidehito Kawai (Hitachi)
Nori Fukuyasu (Linux Foundation)
Annie Fisher (Linux Foundation)
Hiroshi Mine (Hitachi)
Masato Minda (Plat’Home)
Takehisa Katayama (Renesas)
Chris Paterson (Renesas)
Wolfgang Mauerer (Siemens)
Yoshi Kobayashi (Toshiba)
Daniel Sangorrin (Toshiba)
Agenda
Roll Call
Action items
Topic prioritization
Updates and Discussions
Updates and Discussions
DebConf report
CIP had a booth at DebConf
CIP members (Jan, Kazu and Yoshi) had discussion with Debian developers especially with Debian LTS.
We discussed about extended Debian LTS.
Current Debian LTS supports 5 years. CIP member requires 10 years and more.
Project X update
Milestones
Deby board support [ONGOING]
ISAR board support [TODO]
Integrate with B@D CI [ONGOING]
Deby support status
Renesas iwg20m: builds and boots correctly [OK]
U-boot support [OK]
KAS support [ONGOING]
QEMU x86-64: builds and boots correctly [OK]
KAS support [OK]
BBB: builds and boots but no login prompt [ONGOING]
KAS support [TODO]
Cyclone V: waiting for kernel/u-boot repository [TODO]
U-boot support [TODO]
KAS support [TODO]
B@D CI integration status
Installation behind proxy [OK]
https://gitlab.com/cip-project/cip-testing/testing/issues/99
LAVA [OK]
QEMU health check [OK]
BBB health check [TODO]
KernelCI support [OK]
Support for iwg20m [TODO]
Booth demo @ ELCE?
B@D on Renesas board
Using Deby [TODO]
Using Debian? (Renesas Vietnam) [ONGOING]
Using ISAR?
[AI: Daniel S.] Promote Project X more.
Wiki
What is Project X?
Real-time Linux Project
Board for CI-RT
Renesas has shipped out the board to the board member companies already.
[AI: Yoshi] Ask to Anna-Maria for the status of board shipping.
Kernel Maintenance
Report from week 30 to 33 sent to cip-dev ML. Please
review it
Agustín B. sent a
request for clarification
about the two ToDos pointed in this section the previous CIP TSC call.
Coming tasks
Release new version of the CIP kernel
Review Renesas patches.
CIP Testing
Board @ Desk
Report from week 30 to 33 sent to cip-dev ML. Please
review it
The report includes a link to the CIP testing
project plan
.
After LAVA is updated the team will focus on reporting
In order to use an unified output, CIP testing project should align with other similar efforts
ELCE preparation
2 CIP talks accepted
Agustin and Ben
Maintaining a Linux kernel for 13 years ? You must be kidding me. We need at least 30!
Urs and Yoshi
Civil Infrastructure Platform: Industrial Grade Open Source Base-layer Development
Workshop schedule
Date: Oct 22nd. At what time do we start. The proposal from 16 to 19.
Schedule:
https://docs.google.com/spreadsheets/d/1DlaM9Sgtp6mSRhB0inVfHHea8BoALkcjC-QtWrJ-C1M/edit
B@D 101
request for approval
since some material needs to be purchased:
Power Strips: up to 10. Around 100 €
Cables: serial (USB to TTL) and network: 10 Around 200 €
USB sticks: 10 Around 150 €
Approx. Budget: 450 €
(AI) Annie verify the cost of renting these materials from the venue
Activities
Workshop activities (proposals): ToDo: Agustin to set up a wiki page.
Done
B@D 101
Kernel maintenance overview by Ben Hutchings. To be determined what!
Meeting kernel maintenance (Daniel + Ben H. + testers). To be confirmed.
Others?
ELCE booth
B@D shows at specific times, not permanent demo.
B@D showcase could be done during Technical Showcase.
(AI YOSHI) Ask to PC about TS.
Y2038 Q&A
Invite Arnd Bergmann. Agustin sent him a mail. Waiting for an answer.
[AI: ALL] Check booth options