civilinfrastructureplatform:tsc-meetings:tsc_mm_mar192018
CIP Technical Steering Committee F2F Meeting
Roll Call
TSC members
Members
Hidehiro Kawai (Hitachi) (Representative) (Voting)
Takehisa Katayama (Renesas) (Voting)
Yoshi Kobayashi (Toshiba) (Representative) (Voting) - Chair
SZ Lin (MOXA) (Representative)
Jimmy Chen (MOXA)
Wes Huang (MOXA)
Fero Chou (MOXA)
Harry Jhou (MOXA)
Wolfgang Mauerer (Siemens) (Representative) (Voting)
Masato Minda (Plat’Home) (Representative)
Participants
Agustin Benito Bethencourt (Codethink)
Hiroshi Mine (Hitachi)
Yoshiyuki Nitta (Toshiba)
Jeff ErnstFriedman (The Linux Foundation)
Action items from previous F2F meeting
AI (Shibata(LTSI)): Coordinate a f2f meeting with Greg Kroah-Hartman at
OSS Japan
AI (CIP Testing): Renesas will setup the LAVA slave once the master is setup.
AI (CIP Core)(all): Making a list of packages (core packages) (Due date: 31st March, 2018)
AI (IEC62443): Request members ask business units for what documentation and best practices they can share with the rest of CIP, preferably in English to be shared with CIP.
Proposed topics to be discussed during F2F meeting
Debian contribution plan
Real-time
CIP: What’s next?
Chair
Discussions
Report from CIP TSC F2F meeting @ ELC-NA
CIP SLTS kernel version alignment with other project
Projects to be considering version alignment
Tsugikazu Shibata from LTSI share his concern
(Comment) MOXA has engineers, they would like to know how to join the LTS effort. Is there any document?
CIP is very similar to the LTS process, an overwhelming majority of the work is being done upstream.
The best process is to set up an ‘onboarding’ meeting with Ben
CIP SLTS kernel maintenance
CIP kernel 4.4.120-cip20 released.
Latest Renesas patches under review.
Ben H. trip to DebConf sponsorship approved by CIP.
Talk about CIP kernel paper for OSSJ presented.
Moxa has developers to maintain CIP kernel
Kernel maintenance
CIP Core packages
Define set of packages to support for a 10-year time frame to help establish long term cost estimates.
By end of March each member will define a package name/set and from which version specified by package. If a package is not relevant in terms of the 10 year window do not include it. We should begin to be inclusive at the initial review.
Please send package list to cip-members
.
CIP/EdgeX
Real-time
Reference board
Aria10 is able to run with mainline kernel without additional patches
Cyclone-V
About 100 patches need to be added
AI(Hitachi): For CV, need to clarify which features are missing in mainline kernel
For new CIP kernel, each company can propose new boards as reference platform
Industrial communication protocol (OPC-UA)
Update/Upgrade strategy
ARM64
Other updates
CIP Testing
AWS creation of a lava and kernelci instance (4 hours)
install and configure lava via docker (2 hours)
install and configure kernelci via docker (2 hours)
DNS configuration for both instances (1 hour)
Plans for [[https://events.linuxfoundation.org/events/open-source-summit-japan-2018/|OSS-J]]
civilinfrastructureplatform/tsc-meetings/tsc_mm_mar192018.txt · Last modified: 2018/09/20 15:29 by yoshi